Framing the front cabin. |
|
July 2008 |
|
|
|
|
|
|
|
|
|
|
2nd floor balcony view at Far in the Lea. |
|
July 2008 |
|
|
|
|
|
|
|
|
|
|
Interior wall going up first cabin. |
|
July 2008 |
|
|
|
|
|
|
|
|
|
|
Rough in almost complete on the first cabin. |
|
Aug. 2008 |
|
|
|
|
|
|
|
|
|
|
Hangin' with Neil, Josh, & Dante' from K & A Contractors |
|
Aug. 2008 |
|
|
|
|
|
|
|
|
|
|
Blackberry Hollow framed up. |
|
Aug. 2008 |
|
|
|
|
|
|
|
|
|
|
The siding and soffit going on the front cabin. |
|
Aug. 2008 |
|
|
|
|
|
|
|
|
|
|
Roof is complete on the front cabin. |
|
Sept. 2008 |
|
|
|
|
|
|
|
|
|
|
Second cabin nearly roughed in. |
|
Sept. 2008 |
|
|
|
|
|
|
|
|
|
|
Set up and drilling the well. |
|
Oct. 2008 |
|
|
|
|
|
|
|
|
|
|
The well is installed and the water lines have been run to the cabins. |
|
Oct. 2008 |
|
|
|
|
|
|
|
|
|
|
Cleaning up the electric lines right of way across the street. |
|
Oct. 2008 |
|
|
|
|
|
|
|
|
|
|
All done across the street. |
|
Oct. 2008 |
|
|
|
|
|
|
|
|
|
|
The water line dug in through the woods to the 1st cabin. |
|
Oct. 2008 |
|
|
|
|
|
|
|
|
|
|
The roof is complete on the 2nd cabin. |
|
Oct. 2008 |
|
|
|
|
|
|
|
|
|
|
The 2nd cabin with siding and soffit completed. |
|
Oct. 2008 |
|
|
|
|
|
|
|
|
|
|
|
An early winter snow. |
|
Dec. 1 2008 |
|
|
|
|
|
|
|
|
|
|
Crisp clean air. |
|
Dec. 2008 |
|
|
|
|
|
|
|
|
|
|
|
Kathryn visiting with Raspus and Penny |
|
Jan. 2009 |
|
|
|
|
|
|
|
|
|
|
Mitch and Josh from Appalachian Supply delivered the interior wood and drywall. |
|
March 2009 |
|
|
|
|
|
|
|
|
|
|
The first board installed. |
|
March 2009 |
|
|
|
|
|
|
|
|
|
|
2nd floor bathroom ceiling and walls are going in. |
|
March 2009 |
|
|
|
|
|
|
|
|
|
|
Utility room under construction. |
|
March 2009 |
|
|
|
|
|
|
|
|
|
|
The washer and dryer will go on the drywalled wall. |
|
March 2009 |
|
|
|
|
|
|
|
|
|
|
1st floor bedroom entrance from the inside . |
|
March 2009 |
|
|
|
|
|
|
|
|
|
|
1st floor bedroom side wall combination drywall and wood. |
|
March 2009 |
|
|
|
|
|
|
|
|
|
|
A tree uprooted and hit the corner of the first cabin |
|
April 2009 |
|
|
|
|
|
|
|
|
|
|
Ouch |
|
The storm of April 13th 2009 |
|
|
|
|
|
|
|
|
|
|
Utility room finished. |
|
April 2009 |
|
|
|
|
|
|
|
|
|
|
2nd floor bathroom construction underway. |
|
April 2009 |
|
|
|
|
|
|
|
|
|
|